Sale!
Home / Pressure Switches / In Demand Modine 5H0754650000 Hot Surface Igniter Long Lead HVAC Replacement Part

In Demand Modine 5H0754650000 Hot Surface Igniter Long Lead HVAC Replacement Part

Original price was: $129.49.Current price is: $51.80.

For orders under $60.00, a shipping fee of $9.99 applies.
Fast delivery, satisfaction guaranteed.
Secure Payment.
SKU: SK0151337 Category: Tag:
Share

The Modine 5H0754650000 is a hot surface igniter designed for efficient ignition in gas-powered industrial and commercial appliances. Offering a reliable start and made from durable materials, its long lead feature makes it adaptable for various installation setups.

  • Extended lead for flexible installation options
  • Ensures reliable ignition and consistent performance
  • Robust construction suitable for demanding environments

Product Highlights

This igniter is essential for maintaining optimal functionality in heating systems, ensuring a quick ignition and reducing downtime for repairs or adjustments.

Product Information

Standard Information

  • Brand: Modine
  • MPN: 5H0754650000

Technical Specifications

  • Product Type: Long Lead Igniter
  • Collection: Gas Pilot & Ignition – Heating
  • Item Number: 5H0754650000
  • Material: High-quality industrial materials